Server room design is the first step and condition for creation of good IT infrastructure. It is essential to organize the space in data center. This space must meet specific requisites that are very strict.
Some of the requisites are:

Power supply has to be planed to satisfy long term needs, taking in account running needs and farther development of data center. Redundant resources of power supply can also be the part of solution. Supply through UPS is certainly a part of solution, which has to satisfy needed, installed power as well as needed autonomy. Reserve supplies by independent generator is surly a solution in many projects.
Cooling and air conditioning have to assure adequate temperature and humidity of ambient as well as terminate presence of micro particles. The redundancy is surly the important solution. The capacity of equipment for cooling depends on equipment that is installed and planed dynamic of development, of data center. Green data center more frequently uses fresh air for air conditioning, what for result have significant energy saving and reduction on CO2 emission.
How to create an efficient and easily managed desktop infrastructure for Eurovision Song Contest 2008 press center? Find out a solution which delivered very high levels of reliability and could be easily managed by a small IT staff.
How to create a reliable and efficient press-center for the thousand journalists during Eurosong Contest 2008? To configure system fast, to secure data easily, to reduce IT staff for the system maintenance, to lower power consumption by using virtualization technology.
The best choice to meet stability, disaster recover, VDI support, cost effectiveness, and scalability for real-time broadcasting. The solution helps maintain high density video content, provides a reliable 24/7 service delivery, and ensures rapid backup and recovery system.

COMING has developed the solution that meets the needs of modern IT services in SMB segment: complexity, high availability, increase of IT resources, a great number of new services, limited budget.

By using IT datacenter virtualization solution IT resource efficiency increases to 60-80%, number of servers is reduced, while a new server setting lasts a few minutes against 3-4 weeks of purchasing of physical server.

If you plan your business it is necessary to be safe. Only 10% of companies are prepared to continue their business after a catastrophe. COMING has created the . disaster recovery solution

Return on Investment in virtualization by using Vmware VI3 infrastructure is expected in 6-8 to 18-24 months, which makes these projects very profitable. Please calculate cost savings the solution brings.