IT resources rental
COMING - Computer Engineering has four portable data centre infrastructures different sizes consisting of 3 to 8 servers with processing power of 16 quad-core processors with total processing power of 192 GHz and total memory capacity of 256 GB connected on centralized storage with the capacity of 3 to 68 TB, tape library system with the total capacity of 38.6 TB, and needed switching and routing and wireless equipment.
All this infrastructure is virtualized and on the top of it are implemented services Active Directory, AV protection, Internet Proxy and failover services, e-mail, collaboration services, ERP solution (Currently Microsoft Dynamics Nav), CRM solutions, internal content management (IBM Omni Find), support for wireless networking, IP telephony, Video Surveillance, DMBS services (as the foundation for other application services: MS SQL Server, Oracle). Those systems can support also up to 300 virtual desktop clients under VMware View. Those systems are originally designed by COMING under a name All-in-one Data Centre.
With this systems COMING - Computer Engineering can respond in a matter of hours to establish IT data center infrastructure for conferences, trainings, new businesses, natural disasters and other purposes.
This and other IT resources can be delivered to customer over the WAN on the remote location anywhere where the bandwidth can support solution.
Portable disaster recovery service
COMING - Computer Engineering has developed portable disaster recovery solution for the companies whose critical services are already virtualized on the primary site, and which business can stand from 12 to 24 hours without IT services. This solution is very cost effective as it guaranties to recover IT operations in urgent situations in 8 hours from the moment of declaring a disaster.
As the precondition disaster recovery plan has to be made. So in case of disaster costumer provides tape with the consolidated backup, COMING comes on disaster location with portable disaster recovery data centre. Recovery process can be finished in period 8 at latest 24 hours.
This solution, which is obviously needed to secure the business, is far more chipper then building own disaster recovery solution buying equipment and wasting energy for the event which may not appear years. Disaster recovery scenario can be tested on the customer request any time or when the auditors require it.
How to create an efficient and easily managed desktop infrastructure for Eurovision Song Contest 2008 press center? Find out a solution which delivered very high levels of reliability and could be easily managed by a small IT staff.
How to create a reliable and efficient press-center for the thousand journalists during Eurosong Contest 2008? To configure system fast, to secure data easily, to reduce IT staff for the system maintenance, to lower power consumption by using virtualization technology.
The best choice to meet stability, disaster recover, VDI support, cost effectiveness, and scalability for real-time broadcasting. The solution helps maintain high density video content, provides a reliable 24/7 service delivery, and ensures rapid backup and recovery system.

COMING has developed the solution that meets the needs of modern IT services in SMB segment: complexity, high availability, increase of IT resources, a great number of new services, limited budget.

By using IT datacenter virtualization solution IT resource efficiency increases to 60-80%, number of servers is reduced, while a new server setting lasts a few minutes against 3-4 weeks of purchasing of physical server.

If you plan your business it is necessary to be safe. Only 10% of companies are prepared to continue their business after a catastrophe. COMING has created the . disaster recovery solution

Return on Investment in virtualization by using Vmware VI3 infrastructure is expected in 6-8 to 18-24 months, which makes these projects very profitable. Please calculate cost savings the solution brings.